Notable
Features |
. |
![bullet](../../icons/bullet.gif) |
Pecaform (PVC formwork) |
![bullet](../../icons/bullet.gif) |
Structural Steel
Frame |
![bullet](../../icons/bullet.gif) |
Precast façade |
![bullet](../../icons/bullet.gif) |
Precast slab |
![bullet](../../icons/bullet.gif) |
Precast staircase |
![bullet](../../icons/bullet.gif) |
Dry
Wall |
![bullet](../../icons/bullet.gif) |
Precast joinery in kitchen |
![bullet](../../icons/bullet.gif) |
Metal
scaffolding |
![bullet](../../icons/bullet.gif) |
Steel
hoarding |
![](../../icons/backtotop.gif) |
. |
Basic
Information |
. |
![bullet](../../icons/bullet.gif) |
Location:
Admiralty |
![bullet](../../icons/bullet.gif) |
Building
Type: Demonstration flat |
![bullet](../../icons/bullet.gif) |
Contract
Period: 9 months |
![bullet](../../icons/bullet.gif) |
Contract
Sum: HK$ 40,000,000 |
![bullet](../../icons/bullet.gif) |
Site
Area: 4,770m2 |
![bullet](../../icons/bullet.gif) |
Gross
Floor Area: 1,938m2 |
![bullet](../../icons/bullet.gif) |
Client: Integer Hong Kong
Pavilion Ltd. |
![bullet](../../icons/bullet.gif) |
Architect: Integer (UK)/Leigh & Orange Ltd. |
![bullet](../../icons/bullet.gif) |
Structural
Engineer: WSP Hong Kong Ltd. |
![bullet](../../icons/bullet.gif) |
E&M
Consultant: WSP Hong Kong Ltd. |
![bullet](../../icons/bullet.gif) |
Quantity
Surveyor: Franklin & Andrews |
![bullet](../../icons/bullet.gif) |
Main Contractor: Gammon Construction
Ltd. |
![](../../icons/backtotop.gif)
|
. |
Overview |
. |
This
is an exhibition pavilion with demonstration flats. Three storeys height
building contains structural steel frame and concrete modules; laid with
precast slab panels, enclosed by glass wall and metal roof cladding; fitted
with furniture and building services. |
. |
![bullet](../../icons/bullet.gif) |
Construction
to be 'lean', using sustainable materials throughout, capable of being
re-cycled. |
![bullet](../../icons/bullet.gif) |
Construction to
be 'dry', using fast-track methods. |
![bullet](../../icons/bullet.gif) |
Flats, lobby,
sky-court and exhibition area demonstrate components of a real future 40-storey
block. |
|
.
|
Pecaform
(PVC formwork) |
.. |
Pecaform is used to construct
footings and ground beams of the building. It is made by laminating a layer
of polyethylene to each side of a high tensile steel wire mesh. This combination
creates a material that is both light and structurally strong, making it
very easy to handle. The formwork is cut-to size and bent to shape at factory
and arrives at site ready for installation. There is no need to strip formwork
after the concrete has cured. No waste is produced. A clean and neat site
can be obtained in the foundation stage with Pecaform. |
. |
|
. |
![](../../icons/backtotop.gif) |